1/100: 2024-09-04 20:11:01 | ||
---|---|---|
new error: java.io.FileNotFoundException: http://cloud.tfl.gov.uk/TrackerNet/LineStatus
java.io.FileNotFoundException: http://cloud.tfl.gov.uk/TrackerNet/LineStatus at java.base/sun.net.www.protocol.http.HttpURLConnection.getInputStream0(HttpURLConnection.java:2017) at java.base/sun.net.www.protocol.http.HttpURLConnection.getInputStream(HttpURLConnection.java:1610) at net.twisterrob.travel.statushistory.infrastructure.HttpStatusDataSource.downloadFeed(HttpStatusDataSource.kt:48) at net.twisterrob.travel.statushistory.infrastructure.HttpStatusDataSource.getCurrent(HttpStatusDataSource.kt:28) at net.twisterrob.travel.domain.london.status.DomainStatusHistoryRepository.getCurrent(DomainStatusHistoryRepository.kt:26) at net.twisterrob.travel.domain.london.status.DomainRefreshUseCase.refreshLatest(DomainRefreshUseCase.kt:12) at net.twisterrob.travel.statushistory.controller.RefreshFeedController.refreshFeed(RefreshFeedController.kt:28) at net.twisterrob.travel.statushistory.controller.$RefreshFeedController$Definition$Exec.dispatch(Unknown Source) at io.micronaut.context.AbstractExecutableMethodsDefinition$DispatchedExecutableMethod.invokeUnsafe(AbstractExecutableMethodsDefinition.java:461) at io.micronaut.context.DefaultBeanContext$BeanContextUnsafeExecutionHandle.invokeUnsafe(DefaultBeanContext.java:4232) at io.micronaut.web.router.AbstractRouteMatch.execute(AbstractRouteMatch.java:236) at io.micronaut.http.server.RouteExecutor.executeRouteAndConvertBody(RouteExecutor.java:488) at io.micronaut.http.server.RouteExecutor.callRoute(RouteExecutor.java:478) at io.micronaut.http.server.RequestLifecycle.callRoute(RequestLifecycle.java:201) at io.micronaut.http.server.RequestLifecycle.executeRoute(RequestLifecycle.java:191) at io.micronaut.http.server.RequestLifecycle.lambda$normalFlow$1(RequestLifecycle.java:181) at io.micronaut.http.filter.FilterRunner.provideResponse(FilterRunner.java:272) at io.micronaut.http.filter.FilterRunner.filterRequest(FilterRunner.java:207) at io.micronaut.http.filter.FilterRunner.lambda$filterRequest$2(FilterRunner.java:180) at io.micronaut.http.filter.AroundLegacyFilter$FilterChainImpl.proceed(AroundLegacyFilter.java:122) at io.micronaut.views.ViewsFilter.doFilter(ViewsFilter.java:133) at io.micronaut.http.filter.HttpServerFilter.doFilter(HttpServerFilter.java:48) at io.micronaut.http.filter.AroundLegacyFilter.processRequestFilter(AroundLegacyFilter.java:75) at io.micronaut.http.filter.FilterRunner.filterRequest(FilterRunner.java:176) at io.micronaut.http.filter.FilterRunner.run(FilterRunner.java:158) at io.micronaut.http.filter.FilterRunner.run(FilterRunner.java:135) at io.micronaut.http.server.RequestLifecycle.runWithFilters(RequestLifecycle.java:357) at io.micronaut.http.server.RequestLifecycle.normalFlow(RequestLifecycle.java:181) at io.micronaut.servlet.http.ServletHttpHandler$ServletRequestLifecycle.handleNormal(ServletHttpHandler.java:509) at io.micronaut.servlet.http.ServletHttpHandler.lambda$service$5(ServletHttpHandler.java:212) at io.micronaut.servlet.engine.DefaultServletHttpRequest.lambda$executeAsync$1(DefaultServletHttpRequest.java:176) at org.eclipse.jetty.server.handler.ContextHandler.handle(ContextHandler.java:1466) at org.eclipse.jetty.server.AsyncContextState$1.run(AsyncContextState.java:148) at org.eclipse.jetty.util.thread.QueuedThreadPool.runJob(QueuedThreadPool.java:969) at org.eclipse.jetty.util.thread.QueuedThreadPool$Runner.doRunJob(QueuedThreadPool.java:1194) at org.eclipse.jetty.util.thread.QueuedThreadPool$Runner.run(QueuedThreadPool.java:1149) at java.base/java.lang.Thread.run(Thread.java:840) |
2/100: 2024-08-20 03:14:37 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle | Good Service |
better
|
District | Good Service | |
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service |
better
|
Piccadilly |
Part Closure
No service between Wood Green and Cockfosters, No service between Rayners Lane and Uxbridge due to planned engineering work. Customers should use the Metropolitan line as an alternative.
GOOD SERVICE on the rest of the line.
Affected branches: Wood Green - Cockfosters; Rayners Lane - Uxbridge; |
worse
GOOD SERVICE on the rest of the line.¶ |
Victoria | Good Service |
better
|
Waterloo & City | Good Service |
better
|
Overground | Good Service |
better
|
Elizabeth line | Good Service | |
DLR | Good Service |
better
|
Trams | Good Service | |
3/100: 2024-06-29 20:04:55 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Minor Delays
Minor delays due to train cancellations
|
worse
Minor delays due to train cancellations
|
District | Good Service | |
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Part Closure
No service between Golders Green and Edgware due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Golders Green - Edgware; |
worse
No service between Golders Green and Edgware due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Piccadilly |
Severe Delays
severe delays Cockfosters to Hyde Park Corner westbound only while we fix a signal failure. GOOD SERVICE on the rest of the line.
Affected branches: Cockfosters - Hyde Park Corner; Hyde Park Corner - Cockfosters; |
worse
severe delays Cockfosters to Hyde Park Corner westbound only while we fix a signal failure. GOOD SERVICE on the rest of the line.
|
Victoria |
Minor Delays
Minor delays due to train cancellations.
|
worse
Minor delays due to train cancellations.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 on Monday.
|
worse
Service will resume at 06:00 on Monday.¶
|
Overground |
Part Closure
No service between Surrey Quays and Clapham Junction due to planned engineering work.
Affected branches: Surrey Quays - Clapham Junction; |
worse
No service between Surrey Quays and Clapham Junction due to planned engineering work.
|
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Poplar and Beckton due to planned engineering work. GOOD SERVICE on the rest of the DLR.
Affected branches: Poplar - Beckton; |
worse
No service between Poplar and Beckton due to planned engineering work. GOOD SERVICE on the rest of the DLR.¶
|
Trams | Good Service | |
4/100: 2024-06-14 12:01:20 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle | Good Service | |
District | Good Service | |
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service |
better
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City | Good Service | |
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR | Good Service | |
Trams | Good Service |
better
|
5/100: 2024-05-09 06:19:52 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle | Good Service |
better
|
District | Good Service |
better
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays due to train cancellations.
|
worse
Minor delays due to train cancellations.
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City | Good Service |
better
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR | Good Service |
better
|
Trams |
Part Suspended
No service between Reeves Corner, Beckham Junction, Elmers End and New Addington due to a shortage of trams. GOOD SERVICE on the rest of the line.
Affected branches: East Croydon - New Addington; East Croydon - Beckenham Junction; Arena - Elmers End; Reeves Corner - East Croydon; |
worse
No service between
|
6/100: 2024-05-06 06:18:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams |
Part Closure
No service between Elmers End and Arena and between East Croydon and Reeves Corner due to Strike Action. MINOR DELAYS on all other tram routes.
Affected branches: Reeves Corner - East Croydon; Elmers End - Arena; |
better
No service between Elmers End and Arena and between East Croydon and Reeves Corner due to Strike Action. MINOR DELAYS on all other tram routes.
|
7/100: 2024-05-06 06:13:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams |
Part Suspended
No service between Elmers End and Arena and between East Croydon and Reeves Corner due to Strike Action.
Affected branches: Elmers End - Arena; Reeves Corner - East Croydon; |
worse
No service between Elmers End and Arena and between East Croydon and Reeves Corner due to Strike Action.
|
8/100: 2024-05-06 05:43:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service |
better
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
9/100: 2024-05-06 05:18:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays between Edgware and Camden Town southbound due to a track fault at Golders Green. GOOD SERVICE on the rest of the line.
Affected branches: Edgware - Camden Town; |
descr.
Minor delays between
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
10/100: 2024-05-06 05:13:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays between Kennington and Camden Town, northbound only, following a late finish of engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Kennington - Camden Town; Kennington - Camden Town; |
better
Tickets will be accepted on London Buses. |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
11/100: 2024-05-06 04:48:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Severe Delays
Severe delays between Morden and Camden Town, northbound only, following a late finish of engineering work.
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Morden - Camden Town; Morden - Camden Town; |
Severe delays between Morden and Camden Town, northbound only, following a late finish of engineering work.
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line.
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service |
better
|
12/100: 2024-05-06 04:43:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Severe Delays
Severe delays between Morden and Camden Town, northbound only, following a late finish of engineering work.
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Morden - Camden Town; Morden - Camden Town; |
better
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line. |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams |
Part Suspended
No service between Reeves Corner and East Croydon and between Arena and Elmers End due to strike action.
Affected branches: Reeves Corner - East Croydon; Arena - Elmers End; |
worse
No service between Reeves Corner and East Croydon and between Arena and Elmers End due to strike action.
|
13/100: 2024-05-06 04:38:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Part Suspended
No service between Morden and Camden Town, northbound only, due to a late finish of engineering work.
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Morden - Camden Town; Morden - Camden Town; |
descr.
No service between Morden and Camden Town, northbound only, due to a late finish of engineering work.¶
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line. |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
14/100: 2024-05-06 04:33:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Part Suspended
No service between Morden and Camden, northbound only, due to a late finish of engineering work.
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Morden - Camden Town; |
descr.
No service between Morden and Camden
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line. |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
15/100: 2024-05-06 04:28:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Part Suspended
No service between Morden and Camden via Bank, northbound only, due to a late finish of engineering work.
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Morden - Camden Town; |
descr.
No service between Morden and
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line. |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
16/100: 2024-05-06 04:13:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Part Suspended
No service between Morden and Kennington, northbound only, due to a late finish of engineering work.
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Morden - Kennington; |
worse
No service between Morden and Kennington, northbound only, due to a late finish of engineering work. ¶
Tickets will be accepted on London Buses. GOOD SERVICE on the rest of the line. |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
17/100: 2024-05-06 03:28:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service |
better
|
Victoria | Good Service |
better
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
better
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service |
better
|
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service |
better
|
18/100: 2024-05-06 03:23:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
better
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service |
better
|
Jubilee | Good Service |
better
|
Metropolitan | Good Service |
better
|
Northern | Good Service |
better
|
Piccadilly |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Victoria |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Waterloo & City |
Service Closed
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service |
better
|
Elizabeth line |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
better
|
Trams |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
19/100: 2024-05-06 03:18:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service |
better
|
Central | Good Service |
better
|
Circle |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Hammersmith; Earl's Court - Kensington (Olympia); Earl's Court - Wimbledon; |
better
|
Hammersmith & City |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Jubilee |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Metropolitan |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Northern |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Piccadilly |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Victoria |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Waterloo & City |
Service Closed
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Elizabeth line |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
DLR |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Trams |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
20/100: 2024-05-05 23:53:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Central |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Circle |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
District |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Hammersmith & City |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Jubilee |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Metropolitan |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Northern |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Piccadilly |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.¶
|
Victoria |
Service Closed
Service will resume later this morning.
|
worse
|
Waterloo & City |
Service Closed
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground |
Service Closed
Service will resume later this morning.
|
worse
|
Elizabeth line |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.¶
|
DLR |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Trams |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.¶
|
21/100: 2024-05-05 23:48:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.¶
|
Central |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.¶
|
Circle |
Service Closed
Service will resume later this morning.
|
worse
|
District |
Service Closed
Service will resume later this morning.
|
worse
|
Hammersmith & City |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.¶
|
Jubilee |
Service Closed
Service will resume later this morning.
|
worse
|
Metropolitan |
Service Closed
Service will resume later this morning.
|
worse
After the 22:52 departure from Amersham, the next southbound train will be at 23:52. GOOD SERVICE on the rest of the line |
Northern |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.¶
|
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Waterloo & City |
Service Closed
Service will resume at 06:00 Tuesday.
|
worse
Service will resume at 06:00 Tuesday.
|
Overground |
Part Closure
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
Affected branches: Highbury & Islington - Dalston Junction; Highbury & Islington - Stratford; |
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
|
Elizabeth line | Good Service | |
DLR |
Service Closed
Service will resume later this morning.
|
worse
|
Trams | Good Service | |
22/100: 2024-05-05 21:58:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Minor Delays
Minor delays due to earlier trespassers on the track at Stanmore.
|
Minor delays due to earlier trespassers on the track at Stanmore.
|
Metropolitan |
Minor Delays
Minor delays between Moor Park and Amersham due to an earlier customer incident at Baker Street.
After the 22:52 departure from Amersham, the next southbound train will be at 23:52. GOOD SERVICE on the rest of the line
Affected branches: Moor Park - Amersham; |
descr.
Minor delays between Moor Park and Amersham due to
After the 22:52 departure from Amersham, the next southbound train will be at 23:52. GOOD SERVICE on the rest of the line |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground |
Part Closure
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
Affected branches: Highbury & Islington - Dalston Junction; Highbury & Islington - Stratford; |
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
|
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
23/100: 2024-05-05 21:53:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
descr.
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service |
better
|
Jubilee |
Minor Delays
Minor delays due to earlier trespassers on the track at Stanmore.
|
Minor delays due to earlier trespassers on the track at Stanmore.
|
Metropolitan |
Minor Delays
Minor delays between Moor Park and Amersham due to train cancellations. After the 22:52 departure from Amersham, the next southbound train will be at 23:52. GOOD SERVICE on the rest of the line.
Affected branches: Moor Park - Amersham; |
descr.
Minor delays between
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground |
Part Closure
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
Affected branches: Highbury & Islington - Dalston Junction; Highbury & Islington - Stratford; |
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
|
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
24/100: 2024-05-05 21:48:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. MINOR DELAYS anti-clockwise due to an earlier customer incident at Baker Street.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. MINOR DELAYS anti-clockwise due to an earlier customer incident at Baker Street.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City |
Minor Delays
Minor delays between Liverpool Street to Hammersmith, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
Affected branches: Liverpool Street - Hammersmith; |
Minor delays between Liverpool Street to Hammersmith, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
|
Jubilee |
Minor Delays
Minor delays due to earlier trespassers on the track at Stanmore.
|
better
|
Metropolitan |
Minor Delays
Minor delays between Baker Street and Harrow-on-the-Hill, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Baker Street; |
Minor delays between Baker Street and Harrow-on-the-Hill, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground |
Part Closure
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
Affected branches: Highbury & Islington - Dalston Junction; Highbury & Islington - Stratford; |
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
|
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
25/100: 2024-05-05 21:28:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. MINOR DELAYS anti-clockwise due to an earlier customer incident at Baker Street.
Affected branches: Edgware Road - Tower Hill; |
descr.
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. MINOR DELAYS
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City |
Minor Delays
Minor delays between Liverpool Street to Hammersmith, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
Affected branches: Liverpool Street - Hammersmith; |
worse
Minor delays between Liverpool Street to Hammersmith, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
|
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan |
Minor Delays
Minor delays between Baker Street and Harrow-on-the-Hill, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Baker Street; |
Minor delays between Baker Street and Harrow-on-the-Hill, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground |
Part Closure
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
Affected branches: Highbury & Islington - Dalston Junction; Highbury & Islington - Stratford; |
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
|
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
26/100: 2024-05-05 21:23:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. MINOR DELAYS, anti-clockwise, on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
descr.
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan |
Minor Delays
Minor delays between Baker Street and Harrow-on-the-Hill, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Baker Street; |
worse
Minor delays between Baker Street and Harrow-on-the-Hill, westbound only, due to an earlier customer incident at Baker Street. GOOD SERVICE on the rest of the line.
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground |
Part Closure
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
Affected branches: Highbury & Islington - Dalston Junction; Highbury & Islington - Stratford; |
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
|
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
27/100: 2024-05-05 21:13:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground |
Part Closure
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
Affected branches: Highbury & Islington - Dalston Junction; Highbury & Islington - Stratford; |
worse
No service between Camden Road to Stratford, and Highbury & Islington to Dalston Junction due to planned engineering work. GOOD SERVICE on other routes.
|
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
28/100: 2024-05-05 20:48:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service |
better
|
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
29/100: 2024-05-05 20:43:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier points failure at King's Cross St. Pancras.
|
better
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets. |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line |
Minor Delays
Minor delays between Whitechapel and Shenfield due to an earlier faulty train at Farringdon. GOOD SERVICE on the rest of the line.
Affected branches: Whitechapel - Shenfield; |
Minor delays between Whitechapel and Shenfield due to an earlier faulty train at Farringdon. GOOD SERVICE on the rest of the line.
|
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
30/100: 2024-05-05 20:08:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service |
better
|
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Severe Delays
Severe delays due to an earlier points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Severe delays due to an earlier points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line |
Minor Delays
Minor delays between Whitechapel and Shenfield due to an earlier faulty train at Farringdon. GOOD SERVICE on the rest of the line.
Affected branches: Whitechapel - Shenfield; |
worse
Minor delays between Whitechapel and Shenfield due to an earlier faulty train at Farringdon. GOOD SERVICE on the rest of the line.
|
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
31/100: 2024-05-05 19:58:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central |
Minor Delays
Minor delays between Hainault and Leytonstone via Newbury Park while we respond to a customer incident. GOOD SERVICE on the rest of the line.
Affected branches: Hainault - Leytonstone; |
worse
Minor delays between Hainault and Leytonstone via Newbury Park while we respond to a customer incident. GOOD SERVICE on the rest of the line.
|
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Severe Delays
Severe delays due to an earlier points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Severe delays due to an earlier points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
|
Trams | Good Service | |
32/100: 2024-05-05 17:53:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Severe Delays
Severe delays due to an earlier points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Severe delays due to an earlier points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on other DLR routes.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
worse
|
Trams | Good Service | |
33/100: 2024-05-05 17:38:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Severe Delays
Severe delays due to an earlier points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
better
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets. |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Minor Delays
Minor delays between Canning Town and Woolwich Arsenal due to a trespasser on the track earlier at Pontoon Dock.
Affected branches: Canning Town - Woolwich Arsenal; |
Minor delays between Canning Town and Woolwich Arsenal due to a trespasser on the track earlier at Pontoon Dock.
|
Trams | Good Service | |
34/100: 2024-05-05 17:28:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Part Suspended
No service between Walthamstow Central and Victoria and SEVERE DELAYS between Brixton and Victoria while we fix a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
Affected branches: Victoria - Walthamstow Central; Victoria - Brixton; |
No service between Walthamstow Central and Victoria and SEVERE DELAYS between Brixton and Victoria while we fix a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Minor Delays
Minor delays between Canning Town and Woolwich Arsenal due to a trespasser on the track earlier at Pontoon Dock.
Affected branches: Canning Town - Woolwich Arsenal; |
better
|
Trams | Good Service | |
35/100: 2024-05-05 17:13:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Part Suspended
No service between Walthamstow Central and Victoria and SEVERE DELAYS between Brixton and Victoria while we fix a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
Affected branches: Victoria - Walthamstow Central; Victoria - Brixton; |
No service between Walthamstow Central and Victoria and SEVERE DELAYS between Brixton and Victoria while we fix a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Suspended
Severe delays between Canning Town and Woolwich Arsenal due to an earlier trespasser on the track at Pontoon Dock.
Affected branches: Canning Town - Woolwich Arsenal; Westferry - Lewisham; Poplar - Lewisham; |
worse
|
Trams | Good Service | |
36/100: 2024-05-05 17:08:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Part Suspended
No service between Walthamstow Central and Victoria and SEVERE DELAYS between Brixton and Victoria while we fix a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
Affected branches: Victoria - Walthamstow Central; Victoria - Brixton; |
descr.
No service between
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets. |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
37/100: 2024-05-05 16:53:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to earlier trespassers on the track at Stanmore. Tickets are being accepted on London Buses, DLR, Elizabeth line and C2C.
|
better
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Part Suspended
No service between Seven Sisters and Warren Street, and SEVERE DELAYS on the rest of the line, due to a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
Affected branches: Seven Sisters - Warren Street; |
No service between Seven Sisters and Warren Street, and SEVERE DELAYS on the rest of the line, due to a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
38/100: 2024-05-05 16:38:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Part Suspended
No service between Stanmore and Wembley Park, and SEVERE DELAYS on the rest of the line, while we investigate a report of trespassers on the track.
Affected branches: Stanmore - Wembley Park; |
descr.
No service between Stanmore and Wembley Park, and SEVERE DELAYS on the rest of the line, while we investigate a report of trespassers on the track.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Part Suspended
No service between Seven Sisters and Warren Street, and SEVERE DELAYS on the rest of the line, due to a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
Affected branches: Seven Sisters - Warren Street; |
No service between Seven Sisters and Warren Street, and SEVERE DELAYS on the rest of the line, due to a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
39/100: 2024-05-05 16:23:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Part Suspended
No service between Stanmore and Wembley Park while we investigate a report of trespassers on the track. Tickets are being accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Stanmore - Wembley Park; |
No service between Stanmore and Wembley Park while we investigate a report of trespassers on the track. Tickets are being accepted on London Buses. GOOD SERVICE on the rest of the line.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Part Suspended
No service between Seven Sisters and Warren Street, and SEVERE DELAYS on the rest of the line, due to a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
Affected branches: Seven Sisters - Warren Street; |
descr.
No service between
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets. |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
40/100: 2024-05-05 16:18:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Part Suspended
No service between Stanmore and Wembley Park while we investigate a report of trespassers on the track. Tickets are being accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Stanmore - Wembley Park; |
No service between Stanmore and Wembley Park while we investigate a report of trespassers on the track. Tickets are being accepted on London Buses. GOOD SERVICE on the rest of the line.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Part Suspended
No service between Highbury & Islington and Warren Street, and SEVERE DELAYS on the rest of the line, while we fix a points failure at King's Cross St. Pancras.
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets.
Affected branches: Highbury & Islington - Warren Street; |
worse
London Buses, London Overground, Great Northern, Thameslink, Greater Anglia, South Western Railway and Southeastern are accepting tickets. |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
41/100: 2024-05-05 16:13:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Part Suspended
No service between Stanmore and Wembley Park while we investigate a report of trespassers on the track. Tickets are being accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Stanmore - Wembley Park; |
No service between Stanmore and Wembley Park while we investigate a report of trespassers on the track. Tickets are being accepted on London Buses. GOOD SERVICE on the rest of the line.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays while we fix a points failure at King's Cross St. Pancras.
|
worse
Minor delays while we fix a points failure at King's Cross St. Pancras.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
42/100: 2024-05-05 15:38:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Part Suspended
No service between Stanmore and Wembley Park while we investigate a report of trespassers on the track. Tickets are being accepted on London Buses. GOOD SERVICE on the rest of the line.
Affected branches: Stanmore - Wembley Park; |
worse
No service between Stanmore and Wembley Park while we investigate a report of trespassers on the track. Tickets are being accepted on London Buses. GOOD SERVICE on the rest of the line.
|
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
43/100: 2024-05-05 14:03:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service |
better
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
44/100: 2024-05-05 13:03:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service |
better
|
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Acton Town and Uxbridge due to train cancellations. MINOR DELAYS between Acton Town and Heathrow Airport due to an earlier customer incident. GOOD SERVICE on the rest of the line.
Affected branches: Acton Town - Heathrow Terminal 5; Acton Town - Uxbridge; |
Minor delays between Acton Town and Uxbridge due to train cancellations. MINOR DELAYS between Acton Town and Heathrow Airport due to an earlier customer incident. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
45/100: 2024-05-05 12:33:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Acton Town and Uxbridge due to train cancellations. MINOR DELAYS between Acton Town and Heathrow Airport due to an earlier customer incident. GOOD SERVICE on the rest of the line.
Affected branches: Acton Town - Heathrow Terminal 5; Acton Town - Uxbridge; |
descr.
Minor delays between Acton Town and Uxbridge due to train cancellations. MINOR DELAYS between Acton Town and Heathrow Airport due to an earlier customer incident. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
46/100: 2024-05-05 12:13:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Acton Town and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Acton Town - Uxbridge; |
worse
Minor delays between Acton Town and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
47/100: 2024-05-05 11:33:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
worse
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
48/100: 2024-05-05 08:33:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service |
better
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
49/100: 2024-05-05 07:58:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
descr.
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service |
better
|
Jubilee | Good Service | |
Metropolitan | Good Service |
better
|
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Acton Town and Heathrow Airport due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Acton Town - Heathrow Terminal 5; |
Minor delays between Acton Town and Heathrow Airport due to train cancellations. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
50/100: 2024-05-05 07:43:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. MINOR DELAYS between Tower Hill and Hammersmith, westbound only, due to an earlier faulty train.
Affected branches: Edgware Road - Tower Hill; Tower Hill - Hammersmith; |
descr.
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City |
Minor Delays
Minor delays, westbound only, due to an earlier faulty train.
|
worse
Minor delays, westbound only, due to an earlier faulty train.
|
Jubilee | Good Service | |
Metropolitan |
Minor Delays
Minor delays between Aldgate and Baker Street, westbound only, due to an earlier faulty train. GOOD SERVICE on the rest of the line.
Affected branches: Aldgate - Baker Street; |
worse
Minor delays between Aldgate and Baker Street, westbound only, due to an earlier faulty train. GOOD SERVICE on the rest of the line.
|
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Acton Town and Heathrow Airport due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Acton Town - Heathrow Terminal 5; |
Minor delays between Acton Town and Heathrow Airport due to train cancellations. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
51/100: 2024-05-05 07:33:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Earl's Court and Edgware Road / Embankment / Hammersmith / Wimbledon / Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Earl's Court - Edgware Road; Earl's Court - Embankment; Earl's Court - Wimbledon; Earl's Court - Kensington (Olympia); Earl's Court - Hammersmith; |
descr.
No service between Earl's Court and Edgware Road
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Acton Town and Heathrow Airport due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Acton Town - Heathrow Terminal 5; |
descr.
Minor delays between A
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
52/100: 2024-05-05 07:23:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Arnos Grove and Acton Town due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Arnos Grove - Acton Town; |
worse
Minor delays between Arnos Grove and Acton Town due to train cancellations. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
53/100: 2024-05-05 06:53:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
descr.
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
54/100: 2024-05-05 06:48:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. MINOR DELAYS on the rest of the line while we fix a faulty train at Hammersmith.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. MINOR DELAYS on the rest of the line while we fix a faulty train at Hammersmith.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service |
better
|
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
55/100: 2024-05-05 06:08:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. MINOR DELAYS on the rest of the line while we fix a faulty train at Hammersmith.
Affected branches: Edgware Road - Tower Hill; |
descr.
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City |
Minor Delays
Minor delays while we fix a faulty train at Hammersmith.
|
worse
Minor delays while we fix a faulty train at Hammersmith.
|
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
56/100: 2024-05-05 03:33:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Tower Hill; |
better
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
better
|
Hammersmith & City | Good Service |
better
|
Jubilee | Good Service | |
Metropolitan | Good Service |
better
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
better
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service |
better
|
DLR |
Part Closure
No service between Westferry / Poplar and Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Lewisham; Poplar - Lewisham; |
better
|
Trams | Good Service |
better
|
57/100: 2024-05-05 03:28:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service |
better
|
Central | Good Service | |
Circle |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Hammersmith & City |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Jubilee | Good Service | |
Metropolitan |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Service Closed
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
DLR |
Service Closed
Service will resume later this morning however there will be no service between Westferry / Poplar and Lewisham due to planned engineering work.
|
Service will resume later this morning however there will be no service between Westferry / Poplar and Lewisham due to planned engineering work.
|
Trams |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
58/100: 2024-05-05 02:03:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Central | Good Service | |
Circle |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Hammersmith & City |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Jubilee | Good Service | |
Metropolitan |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service |
better
|
Waterloo & City |
Service Closed
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
DLR |
Service Closed
Service will resume later this morning however there will be no service between Westferry / Poplar and Lewisham due to planned engineering work.
|
Service will resume later this morning however there will be no service between Westferry / Poplar and Lewisham due to planned engineering work.
|
Trams |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
59/100: 2024-05-05 01:53:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Central | Good Service | |
Circle |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Hammersmith & City |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Jubilee | Good Service | |
Metropolitan |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Part Suspended
No service bwtween Victoria and Brixton due to emergency engineering work at Pimlico. GOOD SERVICE on the rest of the line.
Affected branches: Victoria - Brixton; |
descr.
No service bwtween Victoria and Brixton
|
Waterloo & City |
Service Closed
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
DLR |
Service Closed
Service will resume later this morning however there will be no service between Westferry / Poplar and Lewisham due to planned engineering work.
|
Service will resume later this morning however there will be no service between Westferry / Poplar and Lewisham due to planned engineering work.
|
Trams |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
60/100: 2024-05-05 01:33:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Central | Good Service | |
Circle |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Hammersmith & City |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Jubilee | Good Service | |
Metropolitan |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Part Suspended
No service bwtween Victoria and Brixton southbound only due to emergency engineering work at Pimlico. GOOD SERVICE on the rest of the line.
Affected branches: Victoria - Brixton; |
worse
No service bwtween Victoria and Brixton southbound only due to emergency engineering work at Pimlico. GOOD SERVICE on the rest of the line.
|
Waterloo & City |
Service Closed
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
DLR |
Service Closed
Service will resume later this morning however there will be no service between Westferry / Poplar and Lewisham due to planned engineering work.
|
Service will resume later this morning however there will be no service between Westferry / Poplar and Lewisham due to planned engineering work.
|
Trams |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
61/100: 2024-05-05 00:23:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Service Closed
Service will resume later this morning.
|
Service will resume later this morning.
|
Central | Good Service | |
Circle |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
Hammersmith & City |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.
|
Jubilee | Good Service | |
Metropolitan |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.
|
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Service Closed
Service will resume at 06:00 Tuesday.
|
worse
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.
|
DLR |
Service Closed
Service will resume later this morning however there will be no service between Westferry / Poplar and Lewisham due to planned engineering work.
|
worse
|
Trams |
Service Closed
Service will resume later this morning.
|
worse
Service will resume later this morning.
|
62/100: 2024-05-05 00:18:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Service Closed
Service will resume later this morning.
|
worse
|
Central | Good Service | |
Circle |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
worse
|
District |
Service Closed
Service will resume later this morning however there will be no service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work.
|
worse
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
63/100: 2024-05-04 23:58:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service |
better
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
64/100: 2024-05-04 22:58:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service |
better
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
65/100: 2024-05-04 22:23:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service |
better
|
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Minor Delays
Minor delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
Minor delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
66/100: 2024-05-04 21:03:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Minor Delays
Minor delays due to an earlier customer incident at West Ham.
|
Minor delays due to an earlier customer incident at West Ham.
|
Metropolitan | Good Service |
better
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Minor Delays
Minor delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
better
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
67/100: 2024-05-04 20:43:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Minor Delays
Minor delays due to an earlier customer incident at West Ham.
|
better
|
Metropolitan |
Minor Delays
Minor delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
Minor delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
68/100: 2024-05-04 20:33:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays northbound only due to an earlier customer incident at West Ham. GOOD SERVICE southbound.
|
Severe delays northbound only due to an earlier customer incident at West Ham. GOOD SERVICE southbound.
|
Metropolitan |
Minor Delays
Minor delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
better
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
69/100: 2024-05-04 20:28:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays northbound only due to an earlier customer incident at West Ham. GOOD SERVICE southbound.
|
Severe delays northbound only due to an earlier customer incident at West Ham. GOOD SERVICE southbound.
|
Metropolitan |
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service |
better
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
70/100: 2024-05-04 20:03:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays northbound only due to an earlier customer incident at West Ham. GOOD SERVICE southbound.
|
Severe delays northbound only due to an earlier customer incident at West Ham. GOOD SERVICE southbound.
|
Metropolitan |
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
better
|
Victoria |
Minor Delays
Minor delays due to an earlier faulty train at Oxford Circus.
|
Minor delays due to an earlier faulty train at Oxford Circus.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
71/100: 2024-05-04 19:53:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays northbound only due to an earlier customer incident at West Ham. GOOD SERVICE southbound.
|
worse
Severe delays northbound only due to an earlier customer incident at West Ham. GOOD SERVICE southbound.
|
Metropolitan |
Severe Delays
Severe delays between Rayners Lane and Uxbridge due to a trespasser on the track earlier at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
better
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track at Ruislip. GOOD SERVICE on the rest of the line.
|
Victoria |
Minor Delays
Minor delays due to an earlier faulty train at Oxford Circus.
|
Minor delays due to an earlier faulty train at Oxford Circus.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
72/100: 2024-05-04 19:48:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier customer incident at Waterloo.
|
worse
Minor delays due to an earlier customer incident at Waterloo.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track at Ruislip. GOOD SERVICE on the rest of the line.
|
Victoria |
Minor Delays
Minor delays due to an earlier faulty train at Oxford Circus.
|
Minor delays due to an earlier faulty train at Oxford Circus.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
73/100: 2024-05-04 19:38:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track at Ruislip. GOOD SERVICE on the rest of the line.
|
Victoria |
Minor Delays
Minor delays due to an earlier faulty train at Oxford Circus.
|
descr.
Minor delays
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
74/100: 2024-05-04 19:33:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
descr.
No service between
|
Victoria |
Minor Delays
Minor delays between Victoria and Brixton due to an earlier faulty train at Oxford Circus. GOOD SERVICE on the rest of the line.
Affected branches: Victoria - Brixton; |
Minor delays between Victoria and Brixton due to an earlier faulty train at Oxford Circus. GOOD SERVICE on the rest of the line.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
75/100: 2024-05-04 19:13:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Part Suspended
No service between South Harrow and Uxbridge while we deal with a trespasser on the track at Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: South Harrow - Uxbridge; |
descr.
No service between
|
Victoria |
Minor Delays
Minor delays between Victoria and Brixton due to an earlier faulty train at Oxford Circus. GOOD SERVICE on the rest of the line.
Affected branches: Victoria - Brixton; |
Minor delays between Victoria and Brixton due to an earlier faulty train at Oxford Circus. GOOD SERVICE on the rest of the line.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
76/100: 2024-05-04 19:08:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
worse
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Part Suspended
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
Affected branches: Rayners Lane - Uxbridge; |
worse
No service between Rayners Lane and Uxbridge while we deal with a trespasser on the track and Ruislip. GOOD SERVICE on the rest of the line.
|
Victoria |
Minor Delays
Minor delays between Victoria and Brixton due to an earlier faulty train at Oxford Circus. GOOD SERVICE on the rest of the line.
Affected branches: Victoria - Brixton; |
Minor delays between Victoria and Brixton due to an earlier faulty train at Oxford Circus. GOOD SERVICE on the rest of the line.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
77/100: 2024-05-04 18:43:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays between Victoria and Brixton due to an earlier faulty train at Oxford Circus. GOOD SERVICE on the rest of the line.
Affected branches: Victoria - Brixton; |
worse
Minor delays between Victoria and Brixton due to an earlier faulty train at Oxford Circus. GOOD SERVICE on the rest of the line.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
78/100: 2024-05-04 17:48:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service |
better
GOOD SERVICE on the rest of the line. |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
79/100: 2024-05-04 16:38:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly |
Severe Delays
Severe delays between Acton Town and Heathrow Airport due to train cancellations and a faulty train at Heathrow Airport. Tickets are being accepted on London Buses and the Elizabeth line.
GOOD SERVICE on the rest of the line.
Affected branches: Acton Town - Heathrow Terminal 5; |
worse
Severe delays between Acton Town and Heathrow Airport due to train cancellations and a faulty train at Heathrow Airport. Tickets are being accepted on London Buses and the Elizabeth line.¶
GOOD SERVICE on the rest of the line. |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
80/100: 2024-05-04 16:33:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service |
better
|
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
81/100: 2024-05-04 16:18:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service |
better
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Minor Delays
Minor delays due to an earlier fire alert at Canary Wharf.
|
Minor delays due to an earlier fire alert at Canary Wharf.
|
Metropolitan | Good Service | |
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
82/100: 2024-05-04 15:08:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier faulty train.
|
Minor delays due to an earlier faulty train.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Minor Delays
Minor delays due to an earlier fire alert at Canary Wharf.
|
Minor delays due to an earlier fire alert at Canary Wharf.
|
Metropolitan | Good Service |
better
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
83/100: 2024-05-04 14:43:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays due to an earlier faulty train.
|
descr.
Minor delays
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Minor Delays
Minor delays due to an earlier fire alert at Canary Wharf.
|
Minor delays due to an earlier fire alert at Canary Wharf.
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
84/100: 2024-05-04 14:28:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays between Elephant & Castle and Queen's Park northbound only due to an earlier faulty train. GOOD SERVICE on the rest of the line.
Affected branches: Elephant & Castle - Queen's Park; |
Minor delays between Elephant & Castle and Queen's Park northbound only due to an earlier faulty train. GOOD SERVICE on the rest of the line.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Minor Delays
Minor delays due to an earlier fire alert at Canary Wharf.
|
descr.
Minor delays due to an earlier fire alert at Canary Wharf.
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
85/100: 2024-05-04 13:53:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays between Elephant & Castle and Queen's Park northbound only due to an earlier faulty train. GOOD SERVICE on the rest of the line.
Affected branches: Elephant & Castle - Queen's Park; |
descr.
Minor delays between
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Minor Delays
Minor due to an earlier fire alert at Canary Wharf.
|
Minor due to an earlier fire alert at Canary Wharf.
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
86/100: 2024-05-04 13:33:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo |
Minor Delays
Minor delays between Queen's Park and Elephant & Castle southbound only due to a faulty train. GOOD SERVICE on the rest of the line.
Affected branches: Queen's Park - Elephant & Castle; |
worse
Minor delays between Queen's Park and Elephant & Castle southbound only due to a faulty train. GOOD SERVICE on the rest of the line.
|
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Minor Delays
Minor due to an earlier fire alert at Canary Wharf.
|
better
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
Minor delays due to a shortage of trains.
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
87/100: 2024-05-04 13:03:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to an earlier fire alert at Canary Wharf. London Buses, DLR, London Overground, Elizabeth line, C2C and Southeastern are accepting tickets.
|
Severe delays due to an earlier fire alert at Canary Wharf. London Buses, DLR, London Overground, Elizabeth line, C2C and Southeastern are accepting tickets.
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays due to a shortage of trains.
|
descr.
Minor delays
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
88/100: 2024-05-04 12:53:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to an earlier fire alert at Canary Wharf. London Buses, DLR, London Overground, Elizabeth line, C2C and Southeastern are accepting tickets.
|
Severe delays due to an earlier fire alert at Canary Wharf. London Buses, DLR, London Overground, Elizabeth line, C2C and Southeastern are accepting tickets.
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
Affected branches: Kennington - Camden Town; |
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
|
Piccadilly | Good Service |
better
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
89/100: 2024-05-04 12:18:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Severe Delays
Severe delays due to an earlier fire alert at Canary Wharf. London Buses, DLR, London Overground, Elizabeth line, C2C and Southeastern are accepting tickets.
|
better
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
Affected branches: Kennington - Camden Town; |
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
|
Piccadilly |
Minor Delays
Minor delays between Acton Town and Heathrow Airport / Uxbridge due to train cancellations and an earlier signalling problem. GOOD SERVICE on the rest of the line.
Affected branches: Acton Town - Heathrow Terminal 5; Acton Town - Uxbridge; |
Minor delays between Acton Town and Heathrow Airport / Uxbridge due to train cancellations and an earlier signalling problem. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
90/100: 2024-05-04 12:13:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Part Suspended
No service between Stratford and London Bridge while we respond to a fire alert at Canary Wharf. London Buses, DLR, London Overground, Elizabeth line, C2C and Southeastern are accepting tickets.
Affected branches: Stratford - London Bridge; |
No service between Stratford and London Bridge while we respond to a fire alert at Canary Wharf. London Buses, DLR, London Overground, Elizabeth line, C2C and Southeastern are accepting tickets.
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
Affected branches: Kennington - Camden Town; |
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
|
Piccadilly |
Minor Delays
Minor delays between Acton Town and Heathrow Airport / Uxbridge due to train cancellations and an earlier signalling problem. GOOD SERVICE on the rest of the line.
Affected branches: Acton Town - Heathrow Terminal 5; Acton Town - Uxbridge; |
worse
Minor delays between Acton Town and Heathrow Airport / Uxbridge due to train cancellations and an earlier signalling problem. GOOD SERVICE on the rest of the line.
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
91/100: 2024-05-04 11:53:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Part Suspended
No service between Stratford and London Bridge while we respond to a fire alert at Canary Wharf. London Buses, DLR, London Overground, Elizabeth line, C2C and Southeastern are accepting tickets.
Affected branches: Stratford - London Bridge; |
descr.
No service between
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
Affected branches: Kennington - Camden Town; |
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
92/100: 2024-05-04 11:48:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Part Suspended
No service between London Bridge and North Greenwich while we respond to a fire alert at Canary Wharf. London Buses, DLR, London Overground, Elizabeth line, C2C and Southeastern are accepting tickets.
Affected branches: London Bridge - North Greenwich; |
descr.
No service between London Bridge and North Greenwich while we respond to a fire alert at Canary Wharf.
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
Affected branches: Kennington - Camden Town; |
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
|
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
93/100: 2024-05-04 11:38:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee |
Part Suspended
No service between London Bridge and North Greenwich while we respond to a fire alert at Canary Wharf. GOOD SERVICE on the rest of the line.
Affected branches: London Bridge - North Greenwich; |
worse
No service between London Bridge and North Greenwich while we respond to a fire alert at Canary Wharf. GOOD SERVICE on the rest of the line.
|
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
Affected branches: Kennington - Camden Town; |
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
|
Piccadilly | Good Service |
better
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
94/100: 2024-05-04 11:13:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern |
Minor Delays
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
Affected branches: Kennington - Camden Town; |
worse
Minor delays between Kennington and Camden Town, via Charing Cross due to a shortage of trains. GOOD SERVICE on the rest of the line
|
Piccadilly |
Minor Delays
Minor delays between Acton Town and Rayners Lane due to train cancellations. GOOD SERVICE on the rest of the line
Affected branches: Acton Town - Rayners Lane; |
Minor delays between Acton Town and Rayners Lane due to train cancellations. GOOD SERVICE on the rest of the line
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
95/100: 2024-05-04 11:03:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan |
Minor Delays
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
Affected branches: Harrow-on-the-Hill - Uxbridge; |
worse
Minor delays between Harrow-on-the-Hill and Uxbridge due to train cancellations. GOOD SERVICE on the rest of the line.
|
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Acton Town and Rayners Lane due to train cancellations. GOOD SERVICE on the rest of the line
Affected branches: Acton Town - Rayners Lane; |
Minor delays between Acton Town and Rayners Lane due to train cancellations. GOOD SERVICE on the rest of the line
|
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
96/100: 2024-05-04 10:58:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Acton Town and Rayners Lane due to train cancellations. GOOD SERVICE on the rest of the line
Affected branches: Acton Town - Rayners Lane; |
Minor delays between Acton Town and Rayners Lane due to train cancellations. GOOD SERVICE on the rest of the line
|
Victoria | Good Service |
better
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
97/100: 2024-05-04 10:48:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly |
Minor Delays
Minor delays between Acton Town and Rayners Lane due to train cancellations. GOOD SERVICE on the rest of the line
Affected branches: Acton Town - Rayners Lane; |
worse
Minor delays between Acton Town and Rayners Lane due to train cancellations. GOOD SERVICE on the rest of the line
|
Victoria |
Minor Delays
Minor delays due to an earlier customer incident at Highbury & Islington.
|
Minor delays due to an earlier customer incident at Highbury & Islington.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
98/100: 2024-05-04 10:03:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria |
Minor Delays
Minor delays due to an earlier customer incident at Highbury & Islington.
|
worse
Minor delays due to an earlier customer incident at Highbury & Islington.
|
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
99/100: 2024-05-04 09:58:01 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
|
District |
Part Closure
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); |
descr.
¶ |
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
Service will resume at 06:00 Tuesday.
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
|
Trams | Good Service | |
100/100: 2024-05-04 09:43:00 | ||
---|---|---|
Line | Disruption Type | Change |
Bakerloo | Good Service | |
Central | Good Service | |
Circle |
Part Closure
No service between Edgware Road and Tower Hill via Embankment due to planned engineering work.
Affected branches: Edgware Road - Tower Hill; |
|
District |
Part Closure
Severe delays between Hammersmith and Ealing Broadway / Richmond due to an earlier trespasser on the track at West Kensington. London Buses, London Overground and South Western Railway are accepting tickets.
No service between Edgware Road and Embankment, Hammersmith, Wimbledon and Kensington (Olympia) due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Edgware Road - Embankment; Edgware Road - Hammersmith; Edgware Road - Wimbledon; Edgware Road - Kensington (Olympia); Hammersmith - Ealing Broadway; Hammersmith - Richmond; |
|
Hammersmith & City | Good Service | |
Jubilee | Good Service | |
Metropolitan | Good Service | |
Northern | Good Service | |
Piccadilly | Good Service | |
Victoria | Good Service | |
Waterloo & City |
Planned Closure
Service will resume at 06:00 Tuesday.
|
|
Overground | Good Service | |
Elizabeth line | Good Service | |
DLR |
Part Closure
No service between Westferry and Poplar, Lewisham due to planned engineering work. GOOD SERVICE on the rest of the line.
Affected branches: Westferry - Poplar; Westferry - Lewisham; |
|
Trams | Good Service | |